YangDong Generators

YangDong Generators

Our product

YangDong Generators in Pakistan — Diesel & Silent Sets (10–50 kVA)

Looking for a dependable YangDong diesel generator in Pakistan—whether for a home, shop, clinic, or factory backup? Genesys supplies and distributes YangDong generator sets from 10 kVA to 50 kVA, with options for silent (canopy) or open-skidsingle-phase or three-phase, and ATS (Automatic Transfer Switch) integration. We’re headquartered at MB-94, Sector 6B, Mehran Town, Korangi Industrial Area, Karachi and arrange delivery/installation nationwide. For a fast, accurate quote, call or WhatsApp +92 332 8777895.

On this page you’ll find plain-English guidance to quickly shortlist the right kVA for your load, understand the configuration options, and learn how pricing is determined in Pakistan. We keep it practical: what each rating can comfortably power, what to double-check before ordering, and how to plan for installation, ventilation, and noise. If you already know your kVA, jump to that section below and request your quote.

Shop by Power Rating (choose your kVA)

10 kVA YangDong

10 kVA YangDong generator is a sensible starting point for a compact home, small office, or kiosk that needs to keep essentials running during outages. Typical uses include lights and fans, a small fridge, a computer or POS system, and a couple of smaller appliances. If you plan to run motor loads—like a deep freezer or a small pump—allow headroom for the inrush current. For residential neighborhoods in Karachi, Lahore, or Islamabad, a silent (acoustic) canopy helps keep noise acceptable for family and neighbors.

Before you request the yangdong 10kva generator price in Pakistan, list your appliances and their starting currents, decide if you need single-phase or three-phase supply, and note the distance from the generator location to your main panel (cable runs impact cost and voltage drop). We’ll also ask about any ATS requirement to automate switchover. With that information, our team can confirm whether 10 kVA is right or if a 15 kVA step-up would give you safer margin for growth. For pricing and lead time, call/WhatsApp +92 332 8777895.

15 kVA YangDong

Stepping up to a 15 kVA YangDong generator suits a small home with 1–2 AC units, a boutique retail outlet, or a clinic that must keep lights, diagnostic equipment, and IT online. The extra capacity covers motor starts more comfortably and gives you breathing room when multiple loads start together. If your premises has sensitive electronics, ask for a controller with proper alarms and protection features; we’ll size breakers and cables accordingly so nuisance trips don’t interrupt operations.

When you inquire about yangdong 15kva generator price in Pakistan, share your peak load scenario (all the things you expect to run at once), your phase requirement (single vs three-phase), and whether you want a silent generator for residential use or an open-skid for a ventilated plant room. We can also quote ATS-ready configurations to simplify installation. If your shop or home is in a dense area—say, Gulshan-e-Iqbal or DHA—our team will recommend canopy and placement practices that respect local noise expectations while keeping airflow and service access practical.

20 kVA YangDong

20 kVA YangDong generator is a strong fit for a larger home, a café with refrigeration and coffee equipment, or a small clinic that runs ACs, lighting, computers, and occasional motor loads. Compared with 15 kVA, the extra headroom reduces the risk of voltage dips when compressors or pumps start together. If you’re backing up POS, routers, and security systems, we’ll recommend a controller configuration with proper undervoltage/overload protection and a clean cable management plan to keep sensitive circuits stable. In mixed-use buildings across Karachi or Lahore, the 20 kVA tier often lands in the sweet spot between fuel economy and real-world starting current needs.

To get your yangdong 20kva generator price in Pakistan, share: (1) a simple load list with starting currents, (2) single- or three-phase requirement, (3) preferred build—silent canopy for neighborhood settings or open-skid for a ventilated plant room, and (4) site photos indicating the proposed location and cable route. We’ll flag any issues such as tight exhaust bends, inadequate airflow, or long cable runs that could cause voltage drop. If you expect future growth—say, adding one more AC next summer—let us know so we can plan margin without oversizing excessively.

30 kVA YangDong

30 kVA YangDong generator is commonly chosen for villas, multi-story homes with several ACs, cold-storage rooms, or SME offices with servers and multiple workstations. At this rating, three-phase is worth considering if your property has a three-phase meter or if you’re driving heavier motor loads (e.g., a 7.5–10 hp motor, elevator, or larger pumps). A 30 kVA set with a sound-attenuated canopy and properly designed ventilation can achieve comfortable neighborhood noise levels while maintaining engine cooling efficiency. We’ll also discuss baseframe fuel tank capacity and practical runtime planning so you’re not refueling at awkward times.

When requesting a quote for yangdong 30kva diesel generator, we’ll ask about motor types, expected duty cycles, and any ATS preference. Correct ATS sizing matters: for example, if your main breaker is rated higher than the generator’s continuous current, we need a coordinated arrangement to avoid nuisance trips. For apartments or commercial sites in Islamabad’s sectors, we’ll check access clearances (delivery path, crane/forklift needs) and recommend a plinth height that mitigates minor flooding or dust ingress. Share your distribution board snapshot, and we’ll advise on cable sizing and breaker coordination at the proposal stage.

50 kVA YangDong

For more demanding loads—mid-size offices, production zones, cold rooms, multi-AC residences, and clinics with imaging equipment—a 50 kVA YangDong generator provides robust starting capacity and better tolerance for load steps. At this tier, three-phase is typical, and installation planning becomes even more important: intake and discharge airflow, hot air segregation inside the canopy, and safe exhaust routing with expansion joints. If uptime is critical, we can propose a maintenance-friendly layout with service clearances, vibration isolation pads, and accessible fuel filtration to reduce downtime during routine PMs.

To receive the yangdong 50kva generator price in Pakistan, tell us your peak kW/kVA, the largest single motor’s rating, and whether you need remote start/stop integration with an ATS. We recommend a site survey—onsite in Karachi or via photos/video call for Lahore/Islamabad—to verify cable lengths, earthing points, and neutral/ground separation at the main panel. We’ll also discuss delivery logistics (truck access, offloading), noise expectations with neighbors, and any municipal guidelines that could affect placement. The result is a clear, itemized proposal that aligns capacity, protection, and installation scope to your site realities.

Configurations & Options

Silent (Canopy) vs Open-Skid

silent (acoustic) canopy reduces perceived noise and shields the set from weather, making it suitable for homes, clinics, schools, and offices in dense areas of Karachi, Lahore, and Islamabad. The canopy’s sound-attenuating panels and controlled airflow paths help keep neighbors comfortable while maintaining cooling performance for the engine and alternator. Because the canopy constrains airflow, installation planning matters: we’ll confirm intake and discharge clearances, avoid recirculation of hot air, and recommend exhaust routing that respects walls, windows, and prevailing winds. Canopies also deter casual tampering and can include lockable access panels that simplify routine maintenance without exposing moving parts. For residential users, the canopy’s neat, compact look is often as important as the acoustic benefit, and it generally increases resale value compared with a bare set.

An open-skid configuration is a strong fit for plant rooms, basements with proper ventilation, or sites where noise is less critical and budget/space flexibility is a priority. Open sets allow excellent service access, making major maintenance operations faster and often cheaper over the life of the unit. Because there’s no acoustic shell, the installation must provide engineered airflow—usually a fresh-air intake, a hot-air discharge path, and a properly sized exhaust line with safe clearances. In Pakistan’s hotter months, open-skid sets can run cooler if the plant room is designed well; however, any misstep in ducting or airflow can quickly produce heat soak. We’ll discuss the trade-offs with photos of your location and recommend the layout that balances acoustic, thermal, and budget goals.

Single-Phase vs Three-Phase

In Pakistan, single-phase sets are common for residential meters and small shops, where the loads are primarily lighting, fans, small appliances, and a few 1–1.5 ton ACs. Single-phase is simpler to wire and can be more cost-effective for lower kVA ratings, but attention to starting currents is essential to avoid voltage dips. If you have a single large motor (for example a deep-well pump), we’ll check starting method and advise on sizing margin or soft-start approaches. When you expect gradual growth—adding another AC next summer or expanding your retail floor—single-phase still works if the final peak current stays within the generator’s capacity and cable/breaker coordination is maintained.

Three-phase sets shine where you have heavier motors, elevators, larger HVAC, or a three-phase utility meter already installed. They allow better distribution of load across phases, improved motor performance, and smoother starting for several inductive loads. In villas, cold rooms, or SMEs with machinery, a three-phase YangDong set in the 20–50 kVA range is common. We’ll help you decide by examining your single-largest motor, diversity of loads, and panel layout. If your site only has single-phase utility service but your machinery needs three-phase, we can discuss practical strategies at proposal stage without oversizing or overcomplicating the system.

ATS (Automatic Transfer Switch) Ready

An ATS (Automatic Transfer Switch) senses utility failure and starts the generator, switching your load to generator power automatically—then reverts to utility when it returns. For homes and clinics, an ATS is primarily about convenience and safety; it prevents manual mistakes under stress and ensures critical circuits (lighting, IT, refrigeration, security) stay powered with minimal delay. We size the ATS based on the main breaker rating and generator continuous current, ensuring the components are coordinated so that the generator is protected without nuisance trips. Proper placement matters too: close to the main distribution board to reduce cable length, with clear labeling and safe access for service.

Pakistan’s grid conditions can involve voltage fluctuations and brief returns; we configure ATS timing (start delay, return-to-mains delay, cool-down) to avoid rapid cycling. Where tenants share a building, we’ll map which circuits are “essential” and which are “non-essential,” so the ATS only transfers what the generator is designed to run. If a remote start/stop or load-shedding logic is needed, we integrate it cleanly and provide a handover guide. For larger kVA or three-phase arrangements, we also discuss neutral switching, earthing strategy, and clear demarcation between utility and generator neutrals to prevent circulating currents.

Controllers & Monitoring

Every YangDong generator we supply includes a digital controller with core protections (over/under voltage, overcurrent, frequency monitoring, emergency stop). We’ll choose the controller tier that fits your site: basic local control for homes and shops, or extended features (event logs, alarms, remote start) for SMEs and clinics. The goal is not gadgetry for its own sake, but the right feature set that improves uptime and reduces the chance of unnoticed faults. Where network connectivity is feasible, we can propose remote notification so key staff are alerted to faults or due services.

For Pakistan’s climate and dust conditions, sensor integrity and cable routing matter as much as the controller brand. We route signal cables away from high-current runs, recommend strain relief, and specify grommets for canopy penetrations. Clear labeling in English/Urdu at the panel makes future service faster and safer. We’ll also provide a simple “first response” checklist—fuel, battery, breakers, emergency stop—so non-technical staff can triage common no-start scenarios before calling for support.

Price Guidance in Pakistan (How pricing is determined)

Factors that move price

Published generator prices often age quickly in Pakistan due to PKR/USD changes, shipping, and component choices. Instead of posting numbers that go stale, we give you a clear framework so you can forecast budget accurately and get a firm quote the same day. Key variables include: kVA ratingcanopy vs open-skidalternator selectioncontroller tierATS sizecable lengthsearthing hardware, and logistics to your city. Certain optional items—base frame fuel tank, battery isolator, vibration pads, and exhaust customizations—also affect the final figure. We’ll itemize these so you can decide what’s essential now and what can wait.

Labor scope matters, too. A “supply only” deal is cheaper than a “turnkey” package that includes installation, cable laying, earthing, commissioning, and user training. Where sites need civil works (plinth, canopy air ducts, exhaust brackets), we’ll either quote them or coordinate with your contractor to ensure the generator specification and civil scope match. This approach prevents surprises on install day and keeps the overall system within budget.

City-wise logistics (Karachi, Lahore, Islamabad)

Location impacts landed cost and scheduling. From our Karachi head office, pickup can be fastest, while deliveries to Lahore and Islamabad will include freight and offloading considerations. Narrow lanes, basement plant rooms, or rooftops may require specialized handling like forklifts, cranes, or extra labor—these logistics affect cost and timeline. For housing societies and commercial plazas, we’ll ask about access hours and noise restrictions so the plan fits local rules. The goal is to provide a single, transparent figure that includes the generator and everything needed to make it run safely at your site.

For remote or mixed-terrain areas, we factor travel time for commissioning and the first service visit. Where in-person surveys are difficult, we can conduct video walk-throughs and request annotated site photos (proposed pad, cable route, board position, exhaust path). This simple pre-work often saves days of back-and-forth and leads to a more accurate quotation on the first pass.

How to get an exact quote today

To receive an itemized quote for your YangDong generator price in Pakistan, share four things on WhatsApp +92 332 8777895: (1) a load list with the largest motor’s details, (2) single- or three-phase requirement, (3) preferred build (silent canopy or open-skid), and (4) site photos showing the planned set location and distance to your main board. If you’re undecided on kVA—10, 15, 20, 30, or 50—we’ll do a quick load alignment and recommend a safe margin without oversizing. We also note any compliance or society requirements that could influence placement or noise expectations.

Once we have this info, we’ll issue a clear proposal: generator set configuration, accessories, ATS option, installation scope, and logistics. We’ll also outline commissioning steps and handover documents (test report, earthing record, operator checklist) so you know exactly what you’re getting. If you need multiple quotes—for example, 20 kVA silent vs 30 kVA open-skid—we’ll provide both with the trade-offs explained in plain language. That way, you can choose based on performance, noise, and budget, not guesswork.

Fuel Consumption & Runtime Basics

What affects diesel consumption

Diesel consumption is driven by the balance between engine size and applied load. Engines operate most efficiently around 60–80% of their rated capacity; very light loading can increase specific fuel consumption and lead to wet-stacking. Ambient temperature, altitude, and maintenance state (filters, injectors, coolant system) also influence burn rate. Even small installation choices—like restricting airflow in a plant room or recirculating hot air near the radiator—can cause the engine to work harder and use more fuel than expected.

Electrical factors matter as well. Induction motors have higher inrush currents at start; frequent starts and stops can create spikes that look like poor fuel efficiency. Good practice includes sequencing heavy loads, using soft starters on large motors where appropriate, and right-sizing the generator so it doesn’t idle far below its capacity. We’ll discuss your duty cycle to ensure the set is matched to how you truly operate, not just a nameplate total.

Estimating your runtime

Runtime planning is about pairing the expected load profile with a realistic tank size. Rather than guessing from generic tables, we estimate consumption from your key loads, expected simultaneity, and typical hours of operation. For example, a set sized correctly for a clinic that runs 10 hours a day will have a different strategy than a home that only needs 2–3 hours during peak outages. We’ll convert the estimate to liters per hour and then to a target refueling interval so you aren’t topping up at inconvenient times.

If you already own a set and want to check consumption, we can run a simple test: note starting fuel level, operate at a known load for a fixed period, and measure the drop. Combined with controller readings for voltage and frequency, this test validates whether the engine is performing as expected or needs service. Routine maintenance—clean filters, correct oil spec, and coolant checks—keeps consumption predictable.

How to reduce fuel burn

The easiest wins are right-sizing and load management. Avoid running at very low load for extended periods; schedule heavy loads to run together within the generator’s sweet spot when possible. Keep the plant room or canopy airflow clear and service obstructions quickly. For motor-heavy sites, soft starters or VFDs can reduce starting surges. Finally, stay on top of preventive maintenance so the engine and alternator operate efficiently. If solar is feasible, a daylight PV contribution can reduce generator hours substantially in summer while the generator covers evening and cloudy periods.

Availability & Support (Pakistan)

Karachi (Head Office)

Visit us at MB-94, Sector 6B, Mehran Town, Korangi Industrial Area, Karachi for consultations, viewing available sets, or arranging surveys and deliveries. For many Karachi customers, pickup or same-city delivery is the fastest route to commissioning. Bring a rough load list or your main breaker rating and our team will help shortlist a suitable YangDong configuration on the spot.

Lahore & Islamabad

We supply, deliver, and commission in Lahore and Islamabad. Share site photos, access notes, and your preferred installation window. We coordinate with building management for offloading, movement to the plant area, and noise considerations. For tight sites, we’ll plan the final position, plinth height, and exhaust route in advance so the installation is swift and compliant.

After-Sales & Parts

Our support covers preventive maintenance, corrective repairs, and parts. We’ll set a service schedule based on hours run and ambient conditions in your city. For parts—filters, belts, hoses, batteries, AVRs, controllers—send your set details and we’ll quote availability. We maintain a practical stock and coordinate special orders when needed. For busy seasons (peak summer), we recommend scheduling service early to avoid queues.

Why Choose YangDong with Genesys?

Proven engine platform

YangDong engines are widely used worldwide for dependable, efficient power in the lower kVA ranges. In Pakistan, that translates to pragmatic value: reliable starts, manageable service, and sensible spares planning without overpaying for capacity you don’t need. We pair the engine with an alternator and controller package that suits your load mix and budget.

Local buying experience

From shortlisting the kVA to commissioning day, we keep the process simple. Our proposals are itemized, the installation plan is clear, and the handover includes operator training and a first-service schedule. If you need ATS integration, remote start, or special exhaust routing, we’ll include these in the same quotation so there are no loose ends.

Compliance & safety

We take earthing, breaker coordination, and cable sizing seriously to protect people and equipment. Labels and isolators are placed where technicians can work safely. Where local rules apply (society or commercial plaza requirements), we make sure the installation aligns with the expectations on noise, placement, and working hours.

FAQs

Price varies with kVA, canopy vs open-skid, alternator class, controller features, ATS size, cables, and logistics. Due to currency and shipping changes, we provide same-day quotes rather than posting numbers that go stale. Share your load and site details for an exact figure.

Beyond the kVA rating, the biggest factors are build type (silent vs open), controller tier, alternator selection, ATS rating, cable lengths, and delivery logistics to your city. We’ll itemize these so you can make a confident choice for today and future growth.

Yes—acoustic canopies reduce perceived noise and provide a neat, weather-protected installation. The key is proper airflow and service clearances so cooling isn’t compromised. We’ll plan the layout to balance noise, performance, and maintenance access.

If you have heavier motors, larger HVAC, or a three-phase meter, then three-phase is recommended. For mainly lighting and small appliances on a single-phase meter, a single-phase set can be more cost-effective—just allow margin for starting currents.

Yes. We supply ATS-ready configurations and size the switchgear to match your main breaker and generator rating. We’ll also set timing delays to avoid rapid cycling during brief utility returns.

Karachi delivery is typically fastest. Lahore and Islamabad deliveries include freight and offloading arrangements. Share access constraints and preferred dates; we’ll plan the movement and commissioning accordingly.

We maintain practical stocks and coordinate special orders as needed. Preventive maintenance schedules and quick-turn repairs keep your set dependable. Share your set details to check parts availability.

Genesys Generator YangDong YD380 m

Genesys Generator YangDong YD480 m

Genesys Generator YangDong YD490 m

Genesys Generator YangDong YD495 m

Contact Us

Our team and customer support 24/7 are available to serve you and to help you.

Head Office: MB-94 sector 6B Mehran Town, Korangi Industrial Area, Karachi, Pakistan​
Islamabad Office: Office #07, 2nd Floor, Segal Emporiums Murree Road, Saddar Cantt, Rawalpindi